SWP Work Impact Survey 1 Name & Organization2 Current Work Structure & Tasks3 Work Impact(s)4 Final Comments Name* First Last Your organization or institute.*(e.g. New Mexico Tech, University of Utah, Sandia National Laboratory, etc) What is your organization's work structure?*What is the current and foreseeable work situation for you, especially as it related to your work on SWP tasks and deliverables?I am entirely working from homeI am able to do some work from my office/labI am furloughedOtherPlease ExplainAre you able to work on your SWP tasks over the next 3 to 6 months?*With the disruption in daily life caused by the coronavirus, are you able to perform the work that is outlined in your Scope of Work (SOW)?YesNoHow much of the time that you committed to the SWP project will you be able to allot to it?*This is a percent of the total time that you originally committed to the SWP project (e.g. 50%)SWP Main Tasks (Select all that apply)*Select the main Task 7 work that you are significantly participating in. Subtask 7.1 Monitoring Subtask 7.2 Refine Site Characterization Data Subtask 7.3 Refine Geologic and Reservoir Models Subtask 7.4 Risk Assessment Subtask 7.1 MonitoringYour 7.1 Monitoring Subtasks (Select all that apply)*Select the Task 7.1 Monitoring subtasks that you are working on. Keep in mind that there are possibly several sub-subtasks for each of the above. Subtask 7.1.1 Monitor Surface and Near-Surface Subtask 7.1.2 Monitor Subsurface Pressure and Temperature Subtask 7.1.3 Sample Reservoir Fluids and Assess Tracer Recovery Subtask 7.1.4 Additional Geophysical Monitoring Subtask 7.1.5 Monitor Well Integrity Subtask 7.1.6 Assess Risks of Microseismicity Subtask 7.1.7 Continue Analysis of Time Lapse VSP Surveys Subtask 7.1.8 Conduct Fluid Accounting 7.1 Monitoring Task/Subtask Work Impact*No ImpactLittle ImpactModerate ImpactSignificant ImpactUnable to work on Deliverable(s)Deliverable / Milestone deadline(s)?*For the Monitoring (7.1) tasks/subtasks that you listed above, do you think you will be able to fulfill the stated task deliverables and milestones by their due date(s)?YesNoNot SureComments and/or explanation on Impacts on 7.1 Monitoring Tasks/SubtasksSubtask 7.2 Refine Site Characterization DataYour 7.2 Refine Site Characterization Data Subtasks (Select all that apply)*Select the Task 7.2 Site Characterization subtasks that you are working on. Keep in mind that there are possibly several sub-subtasks for each of the above. Subtask 7.2.1 Conduct Fluid/Rock Interaction Studies Subtask 7.2.2 Characterize Flow Units and Geobodies Subtask 7.2.3 Conduct Swelling Study of FWU Crude Oil Subtask 7.2.4 Refine interpretations of existing seismic data 7.2 Site Characterization Task/Subtask Work Impact*No ImpactLittle ImpactModerate ImpactSignificant ImpactUnable to work on Deliverable(s)Deliverable / Milestone deadline(s)?*For the Site Characterization (7.2) tasks/subtasks that you listed above, do you think you will be able to fulfill the stated task deliverables and milestones by their due date(s)?YesNoNot SureComments and/or explanation on Impacts on 7.2 Site Characterization Tasks/SubtasksTask 7.3 Refine Geologic and Reservoir ModelsYour 7.3 Modeling Subtasks (Select all that apply)*Select the Task 7.3 Modeling subtasks that you are working on. Keep in mind that there are possibly several sub-subtasks for each of the above. Subtask 7.3.1 Refine Geologic Model Subtask 7.3.2 Update Reservoir Model Subtask 7.3.3 Resolve Low-Grade Faults via Modeling Subtask 7.3.4 Relative Permeability Analysis Subtask 7.3.5 Reactive Transport Modeling Subtask 7.3.6 Conduct Dynamic Reservoir Modeling Subtask 7.3.7 Fluid Characterization, Rock Physics, and Fluid Substitution Modeling Subtask 7.3.8 Analyze Production, Pressure and Rate Transient Data 7.3 Modeling Task/Subtask Work Impact*No ImpactLittle ImpactModerate ImpactSignificant ImpactUnable to work on Deliverable(s)Deliverable / Milestone deadline(s)?*For the Modeling (7.3) tasks/subtasks that you listed above, do you think you will be able to fulfill the stated task deliverables and milestones by their due date(s)?YesNoNot SureComments and/or explanation on Impacts on 7.3 Modeling Tasks/SubtasksSubtask 7.4 Risk AssessmentYour 7.4 Risk Assessment Subtasks (Select all that apply)*Select the Task 7.4 Risk Assessment subtasks that you are working on. Keep in mind that there are possibly several sub-subtasks for each of the above. Subtask 7.4.1 Quantify Risk Subtask 7.4.2 Risk Communication Subtask 7.4.3 Update and Formalize Risk Mitigation Plan 7.4 Risk Assessment Task/Subtask Work Impact*No ImpactLittle ImpactModerate ImpactSignificant ImpactUnable to work on Deliverable(s)Deliverable / Milestone deadline(s)?*For the Risk Assessment (7.4) tasks/subtasks that you listed above, do you think you will be able to fulfill the stated task deliverables and milestones by their due date(s)?YesNoNot SureComments and/or explanation on Impacts on 7.4 Risk Assessment Tasks/Subtasks Final Feedback, Comments or Additional ExplanationsThe SWP Project Management team would very much like to thank you for taking the time to complete this survey.NameThis field is for validation purposes and should be left unchanged.